Don't let information requests, non-conformances, progress payment stages and legal checkpoints get scattered across email and spreadsheets. Bridge makes them all traceable in one place, with owner and status.
No credit card required · Starter plan is free
Which request is with whom, which non-conformance is open, which progress payment is at which stage — all clear at a glance.
Log information requests, assign an owner and deadline, track the response process.
Record non-conformances; track corrective action and closure status.
Track progress payment processes stage by stage; approval and payment steps stay visible.
Define mandatory control and approval points; make sure none of them are skipped.
In construction projects, information requests (RFI) and non-conformance records (NCR) often get lost in email chains and scattered spreadsheets. An RFI left open or an unclosed NCR leads to delays, rework and lost entitlements. When the owner, deadline and status of these items aren't clearly tracked, problems are noticed too late.
Bridge brings these processes together in a single panel within the context of the project and task. Alongside progress payment stages and legal checkpoints, the status, owner and history of every item become traceable. This makes auditing easier, catches delays earlier and keeps the process transparent.
An RFI (Request for Information) is a request for information or clarification; an NCR (Non-Conformance Report) is a record of a non-conformance. Both are critical items that need to be tracked in construction processes.
Yes. Progress payment stages, RFI, NCR and legal checkpoints are tracked in the same panel, together with their statuses.
Yes. Each item has a responsible person, a deadline and a status; delays are highlighted with notifications.
Bring RFI, NCR, progress payments and legal checkpoints into a single panel; make auditing easier.